Example: Sewage and miscellaneous drainage from the temporary on-site office.
Two operating units were installed at the temporary office on-site where the slope cannot be directed to the drainage pit! During the concentrated break time, both units operate simultaneously!
Pumping wastewater from a temporary office that is far from the drainage pit and cannot achieve proper gradient using the Instant Drainage Pump 2. We operate two units simultaneously during peak usage times, such as breaks, and provide backup operation with a standby pump in case of pump failure, ensuring safe usage. Even in sites with constraints on operation periods and space, we were able to establish a low-cost drainage system in a short time. 【Features】 ■ No need for a drainage pit ■ Pumps are made of cast iron, robust and quiet ■ Semi-vortex impeller for wastewater ■ Inline design allows for space-saving installation ■ Can be installed quickly and at low cost *For more details, please contact us or download the catalog to view.